BASED IN SALEM · SERVING SIX OREGON COUNTIESLET’S TALK ABOUT YOUR PROJECT (503) 362-7000
On-Site Septic and Excavation

THE INSTALLATION PROCESS

A good system
starts with a plan.

A general guide to the conversations and stages involved in a septic installation.

01

DISCUSS THE PROPERTY

Share the location, intended use, existing system information, and what you need from the project.

02

EVALUATE & DESIGN

Site conditions and a professional design determine the appropriate system and layout.

03

CONFIRM THE REQUIREMENTS

Review applicable approvals, responsibilities, scope, and timing before installation begins.

04

PREPARE & INSTALL

Coordinate site access, excavation, materials, and installation around the agreed plan.

05

INSPECT & HAND OVER

Complete required checks and keep the system layout and maintenance information with your property records.

The exact sequence depends on your property, system design, and local requirements.

YOUR NEXT PROJECT STARTS HERE

Let’s build something
that works.